Starting product :, car, 4x4, truck tyres, agri tyres max diam. 1.400
mm and max thickness 300 mm., Final product : 80 - 100 mm.chopped
(for inceneration), 4 - 6 mm.crumbs, 2 - 4 mm.crumbs, 1 - 2 mm.crumbs,
0,5 - 1 mm.crumbs, 4 operators per shift, required space : about 45 x
25 mt., calculated on a 220 days/year 8 h/day = 7.040 T/year - 16
h/day = 14.080 T/year, Harmonized steel as a residual product.,
Average throughput rate of granulate : 4 Ton/h in input, (throughput
rate depends on feeding rate and on the kind of tires, estimated 3,5
T/h), installed power : about 900 kw used at 65%, Delivery time :
about 6 months from confirmation, Main machines:, Debeader - automatic
(45-50 tyres /h), for truck tyres only, feeding conveyor belt, Dual
shaft shredder 1.500 mm wide, transport belt, discs screen, transport
belt, transport belt for fine material, transport belt to return
oversized material to shredder, n.2 High speed granulators 1.600 mm
wide rotor, n. 2 extraction belts, vibrating table, Overbelt magnetic
separator, metal fraction discharging belt, transport belt, Buffer
with inbuilt screw conveyor, Chopped material is stored in the buffer
for further size reduction, separation and cleaning.,
----------------------------------------------------------------------
----, screw to fine granulator, Fine granulator 2.000 mm wide rotor,
extraction screw for material, textile fiber separation table, 4-steps
vertical screening unit, n.4 transport screws, G5737941 n.3
densimetric tables for crumb cleaning, dust cleaning unit, n.4
transport screws to big bag loading stations, The dust reducing system
acting on material transport and textile separating table consists
in:, connection pipes, cyclone, dust reducing filter, vacuum hood,
Control panel for management of the whole line, The line can be
completed with a
[PULVERIZER](.germanplast.eu/listings/4596835-rubber-pulverizing-plant
). to reach the finest granulometry., installed power - used power in
work: about 60-65% : 900, capacity: 3-4 Ton/h <6 mm granulate,
delivery time: about 6 months from confirmation, Payment Terms:
deposit + LC